Search
Close this search box.

How Does A Newbie Operator Become A Master?

You're here:
Home » How Does A Newbie Operator Become A Master?
Share This Post

Trick 1: compression method to change according to load and shock

1 in the soft soil operation, because the load is light, after a large flow output, can be high-speed pressurized drilling.

2 when the clay layer is operated, there must be continuous pressure, to ensure that the high speed with low load drilling.

3 when the friction is relatively large sand, to constant pressure and back pressure, otherwise you have to work at least 3 hours, not to mention the wear condition of your machine.

4 when you encounter a high-precision oscillation geology, it needs the brave. constantly pressurized forced crushing.

Trick 2: drill pipe speed through the geological soft and hard strength and category to control the output of revolutions

1 don’t look down on the pebble layer, You have to remember to avoid hard spearheads when you are operating, using slow speed drilling, and work efficiency that is a word —— high.

2 if you are a bit anxious, in the smooth mud stone and harder sand layer operation, you must be patient, you will find that it is so easy with low-speed drilling.

3 experienced the bottom of the gravel know, broken edge teeth that are a small thing, in the high-speed operation of the gravel layer, heard a bang, the drill pipe was almost twisted off, later knew, to use medium speed drilling, otherwise repair the cost of the rig is scary

4 in the smooth bottom operation, high-speed drilling is no problem
The rotary drilling rig is equipped with a drilling tool with a drilling hole hammer. During the construction, the impact work and impact frequency generated are directly transmitted to the hammer head, which quickly crushes the rock within the diameter of the pile hole and then pours it into a pile.

Trick 3 :The engine speed is well adjusted, energy saving and efficient

This point needs to be controlled by the machine friends themselves, because the load and shock of each project are different, and the action of each machine is also different. Therefore, it is necessary to adjust the engine speed well, so as to save energy and complete the task more efficiently.
Share the Post:
Table of Contents
    Add a header to begin generating the table of contents

    Blog Search

    Recent Posts

    How To Choose The Drill Tools Base On Different Construction Site

    Rotary drilling rigs are the most common equipment in current piling construction. Since the geological conditions of each place are different, how to choose the ...
    Read More →

    Unicorn drill tools Items suitable for all of rig models

    Unicorn drill tools Items suitable for all of rig models. Welcome to inquiry us to know the details.Choose the best one for your projects! Tel: ...
    Read More →

    How to deal with the rotary drilling rig slipping when drilling into mudstone or silt layer

    Introduction: When rotary drilling rigs drill into mudstone or silt layers, they often slip. That is, the pressurization action of the drilling rig is ineffective ...
    Read More →

    Join Our Newsletter

    Scroll to Top

    Professional Drill Machine Manufacturer

    Let's have a chat

    This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.